This contract consists of managing the constrcution phase services
for the Metropolitan St.Louis Sewer District (MSD)’s construction
of this state-of-the-art wastewater treatment facility, which will
feature a living classroom for educational community outreach activities.
Owner:
Metropolitan St. Louis Sewer District
KWAME Role:
Construction Management
Architect:
N/A
KWAME Scope:
KWAME is responsible for performing all quality assurance and, control,
instrumentation resident engineering, inspection services, estimating,
scheduling, document and cost control systems. This state-of-the-art
facility will be capable of processing 28 million gallons per day
(MGD) of sewage, with a peak build out capacity of 56 MGD by 2020.
Cost Data:
$90 million Total Construction Cost
Timeline:
Scheduled Completion 2006
Contact:
Brian Hoelscher
Assistant Director of Program Management
Metropolitan St. Louis Sewer District
2000 Hampton Avenue
St. Louis, MO 63139
(314) 768-6200
 |