|
This road project consists of the design of three bridge replacements
and associated roadway improvements on Route 367 from Halls Ferry
Circle to Route 67. This roadway improvement is approximately 6.7
miles.
Owner:
Missouri Department of Transportation
KWAME Role:
Project Controls
Architect:
N/A
KWAME Scope:
KWAME’s role as a subconsultant on this project is to assist
in the total project controls management that will include completion
of final design of the reconstruction of Route 367. Scheduling,
estimating, cost control, and document control are included in the
scope of responsibilities.structure.
Cost Data:
$100 million total construction cost
Timeline:
Scheduled Completion 2005
Contact:
Barry Rolle, P.E.
Project Manager
HDR, Inc.
11775 Borman Drive, Ste 320
Maryland Heights, MO 63141
 |