|
This project will improve drainage along several roadways by demolishing
the existing curbs, gutters, and over-built asphalt and replacing
these items with taller curbs, more sewer inlets, and proper asphalt
depth.
Owner:
City of Northwoods
KWAME Role:
Construction Management
Engineer:
TBD
KWAME Scope:
KWAME is involved in all phases of this project from programming
and conceptual design through construction. KWAME is providing estimating,
project controls (scheduling, cost and document), construction management,
testing and construction procurement support.
Cost Data:
$800,000 total construction cost
Timeline:
In Progress
Contact:
Eroll Bush
Mayor of Northwoods
4600 Oakridge Blvd.
Northwoods, MO 63121
(314) 385-8000
 |