|
The objective of this project is to improve drainage along several
roadways by demolishing the existing curbs, gutters, and over-built
asphalt and replacing these items with taller curbs, more sewer
inlets, and proper asphalt depth.
OWNER:
City of Northwoods
Northwoods, MO
ENGINEER:
IDEAL Engineering
KWAME ROLE:
Construction Manager
KWAME SCOPE:
KWAME is involved in all phases of this project from programming
and conceptual design through construction. Services include testing
consultants, construction supervision, and estimating.
COST DATA:
$300,000 – Total Construction Cost
TIMELINE:
Completed 1999
CONTACT:
Mr. Eroll Bush
Mayor
4600 Oakridge Blvd.
Northwoods, MO 63121
(314)385-8000
 |