The program consists of the site preparation, demolition, infrastructure
development, and construction of the following facilities: Barnes
Jewish North and Barnes Jewish South. Barnes North includes an ambulatory
care center (211,000 sq. ft.), Cancer Center (67,000 sq. ft.), Diagnostic
Treatment space (240,000 sq. ft.), parking garage (1000 cars), and
connecting bridges and tunnels. Barnes South includes an Emergency
Lab (235,000 sq. ft.), parking structure (750 cars), MetroLink Station,
and surgery renovations (4,200 sq. ft.) North Campus South Campus
Owner:
BJC Health System
KWAME Role:
Construction Management
Architect:
HOK/Cannon/Christner
KWAME Scope:
KWAME’s construction management services currently encompass
the pre-construction and construction stages on this multi-phased
project. KWAME’s scope includes: working with the owner and
architect throughout the design phase; general management and coordination;
on-site management; coordination of testing; control of inspections
and shop drawing submissions. In addition, the scope includes review
of progress payment and change order requests; scheduling administrations;
provision and supervision of general condition items; and close-out
of the project.
Cost Data:
$200 million total construction cost
Timeline:
Completed in 2001