Work on the Lambert Airfield Lighting involved electrical construction
management, inspection services, and documentation. KWAME was the
on-site rep for the project to assist the Airport Authority with
scheduled outages in order to minimize those events and to develop
construction schedules in conjunction with the contractor.
Owner:
St. Louis Airport Authority
KWAME Role:
Civil Design/Computerized Drafting
Architect:
Booker Associates, Inc.
KWAME Scope:
KWAME provided all civil and electrical computerized drafting for
the project as well as field inspections of lighting installations.
As the on-site representative for the project, KWAME monitored the
installation of lighting control equipment in the existing air traffic
control tower.
Cost Data:
$8 million total construction cost
Timeline:
Completed 1995